Sarai

EV charging station · Abbottabad

Cedarwood Hotel and Resort Shogran

7 kW ACTYPE2PKR 150/kWh

Cedarwood Hotel and Resort Shogran is an AC charging point in Abbottabad, operated by Cedarwood Hotel. It is at Shogran, Shogran, 56.8 km from the city centre. It delivers up to 7 kW over TYPE2 at PKR 150 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.

Charging details

Location
Shogran, Shogran · 56.8 km from Abbottabad centre
Operator
Cedarwood Hotel
Charger type
AC · 7 kW
Connectors
TYPE2
Price
PKR 150/kWh — reported by drivers, advisory
Coordinates
34.63992, 73.45988 · Open in Google Maps
Listing
Community listing · last checked 2026-09-18

What a charge here costs, by car

20% to 80% — the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 150/kWh.

CarBatteryDraws20→80%TimeCost
BYD Atto 3 60 kWh 7 kW 36 kWh ~327 min PKR 5,443
MG ZS EV 72 kWh 7 kW 44 kWh ~393 min PKR 6,534
BYD Seal 82 kWh 7 kW 50 kWh ~447 min PKR 7,425
BYD Atto 2 45 kWh 7 kW 27 kWh ~244 min PKR 4,059
BYD Sealion 7 82 kWh 7 kW 50 kWh ~447 min PKR 7,430
Deepal S07 EV 79 kWh 7 kW 48 kWh ~433 min PKR 7,197

Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.

Nearest alternatives

If Cedarwood Hotel and Resort Shogran is occupied, out of order or shut, these are the closest:

All 14 chargers in Abbottabad →

Frequently asked questions

Where is Cedarwood Hotel and Resort Shogran?

Cedarwood Hotel and Resort Shogran is at Shogran, Shogran, 56.8 km from the centre of Abbottabad. The directions button opens turn-by-turn navigation.

How fast is charging at Cedarwood Hotel and Resort Shogran?

It is a AC charger rated at 7 kW over TYPE2. A BYD Atto 3 draws up to 7 kW here, so 20 to 80 percent takes about 327 minutes.

How much does it cost to charge at Cedarwood Hotel and Resort Shogran?

The listed price is PKR 150 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 5,443.

Which connector does Cedarwood Hotel and Resort Shogran use?

TYPE2. Check your car's page for what it takes.

Does it still work?

Read the latest driver reports, confirm it works, or report a problem — in the app.

← All EV charging stations in Abbottabad

Download the app Join on WhatsApp