Motorway routes
Each route lists the chargers within 25 km of the road, in driving order, and flags any stretch longer than 220 km without DC fast charging.
- Lahore → Islamabad (M-2 Motorway)375 km · 28 DC fast · 1 long gap
- Islamabad → Peshawar (M-1 Motorway)155 km · 20 DC fast
- Lahore → Multan (M-3 / M-4)345 km · 22 DC fast
- Multan → Sukkur (M-5 Motorway)390 km · 8 DC fast · 1 long gap
- Karachi → Hyderabad (M-9 Motorway)136 km · 14 DC fast
- Hyderabad → Sukkur (N-5 National Highway)330 km · 3 DC fast · 1 long gap
- Lahore → Karachi (the full run)1210 km · 40 DC fast · 2 long gaps
- Lahore → Sialkot (M-11 Motorway)103 km · 16 DC fast
- Rawalpindi → Abbottabad (Hazara Motorway)120 km · 16 DC fast