EV charging station · Sukkur
HUBCO - PSO Bedal Petroleum Services, Sukkur
HUBCO - PSO Bedal Petroleum Services, Sukkur is a DC fast charger in Sukkur, operated by HUBCO green. It is at N5 Highway, Sukkur, 8.2 km from the city centre. It delivers up to 60 kW over CCS2 at PKR 200 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
Charging details
- Location
- N5 Highway, Sukkur · 8.2 km from Sukkur centre
- Operator
- HUBCO green
- Charger type
- DC fast · 60 kW
- Connectors
- CCS2
- Charging points
- 2
- Price
- PKR 200/kWh — reported by drivers, advisory
- Phone
- 03337144333
- Coordinates
- 27.66847, 68.92956 · Open in Google Maps
- Listing
- Community listing, verified
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice — call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% — the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 200/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 60 kW | 36 kWh | ~48 min | PKR 7,258 |
| MG ZS EV | 72 kWh | 60 kW | 44 kWh | ~58 min | PKR 8,712 |
| BYD Seal | 82 kWh | 60 kW | 50 kWh | ~66 min | PKR 9,900 |
| BYD Atto 2 | 45 kWh | 60 kW | 27 kWh | ~36 min | PKR 5,412 |
| BYD Sealion 7 | 82 kWh | 60 kW | 50 kWh | ~66 min | PKR 9,907 |
| Deepal S07 EV | 79 kWh | 60 kW | 48 kWh | ~64 min | PKR 9,596 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If HUBCO - PSO Bedal Petroleum Services, Sukkur is occupied, out of order or shut, these are the closest:
-
25.6km awayAziz Light and SolarKhairpur · Main Bypass, Shah Hussain, Khairpur, Pakistan60 kW DC PKR 90/kWh
-
140.8km awayHUBCO - PSO New Ali MoroDadu · Moro, N5 Highway, Moro60 kW DC PKR 120/kWh
-
216.5km awayHUBCO - ZahirPir Filling Station, South Bound (M-5)Khanpur · M-5 Motorway, Zahir Pir120 kW DC PKR 200/kWh
-
216.6km awayHUBCO - ZahirPir Filling Station, North Bound (M-5)Khanpur · M-5 Motorway, Zahir Pir120 kW DC PKR 200/kWh
-
257.2km awayHUBCO - PSO Al FalahHyderabad · Hyderabad Bypass road, Hyderabad, Sindh60 kW DC PKR 150/kWh
-
298.6km awayAl-Madina CNG Station – M-9 NooriabadKotri · M-9 Motorway, Nooriabad, Nooriabad150 kW DC PKR 110/kWh
On the way to somewhere
HUBCO - PSO Bedal Petroleum Services, Sukkur sits on these motorway routes, planned stop by stop:
Frequently asked questions
Where is HUBCO - PSO Bedal Petroleum Services, Sukkur?
HUBCO - PSO Bedal Petroleum Services, Sukkur is at N5 Highway, Sukkur, 8.2 km from the centre of Sukkur. The directions button opens turn-by-turn navigation.
How fast is charging at HUBCO - PSO Bedal Petroleum Services, Sukkur?
It is a DC fast charger rated at 60 kW over CCS2. A BYD Atto 3 draws up to 60 kW here, so 20 to 80 percent takes about 48 minutes.
How much does it cost to charge at HUBCO - PSO Bedal Petroleum Services, Sukkur?
The listed price is PKR 200 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 7,258.
What are the opening hours at HUBCO - PSO Bedal Petroleum Services, Sukkur?
It is listed as open 24 hours, seven days a week.
Which connector does HUBCO - PSO Bedal Petroleum Services, Sukkur use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem — in the app.