EV charging station · Dadu
HUBCO - PSO New Ali Moro
HUBCO - PSO New Ali Moro is a DC fast charger in Dadu, operated by HUBCO Green. It is at Moro, N5 Highway, Moro, 25.2 km from the city centre. It delivers up to 60 kW over CCS2 at PKR 120 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
Charging details
- Location
- Moro, N5 Highway, Moro · 25.2 km from Dadu centre
- Operator
- HUBCO Green
- Charger type
- DC fast · 60 kW
- Connectors
- CCS2
- Price
- PKR 120/kWh — reported by drivers, advisory
- Phone
- 03002478828
- Coordinates
- 26.69047, 68.02584 · Open in Google Maps
- Listing
- Community listing · last checked 2026-09-18
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice — call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% — the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 120/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 60 kW | 36 kWh | ~48 min | PKR 4,355 |
| MG ZS EV | 72 kWh | 60 kW | 44 kWh | ~58 min | PKR 5,227 |
| BYD Seal | 82 kWh | 60 kW | 50 kWh | ~66 min | PKR 5,940 |
| BYD Atto 2 | 45 kWh | 60 kW | 27 kWh | ~36 min | PKR 3,247 |
| BYD Sealion 7 | 82 kWh | 60 kW | 50 kWh | ~66 min | PKR 5,944 |
| Deepal S07 EV | 79 kWh | 60 kW | 48 kWh | ~64 min | PKR 5,758 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If HUBCO - PSO New Ali Moro is occupied, out of order or shut, these are the closest:
-
116.4km awayAziz Light and SolarKhairpur · Main Bypass, Shah Hussain, Khairpur, Pakistan60 kW DC PKR 90/kWh
-
140.8km awayHUBCO - PSO Bedal Petroleum Services, SukkurSukkur · N5 Highway, Sukkur60 kW DC PKR 200/kWh
-
145.1km awayHUBCO - PSO Al FalahHyderabad · Hyderabad Bypass road, Hyderabad, Sindh60 kW DC PKR 150/kWh
-
169.5km awayAl-Madina CNG Station – M-9 NooriabadKotri · M-9 Motorway, Nooriabad, Nooriabad150 kW DC PKR 110/kWh
-
169.6km awayAli Baba CNG Filling StationKotri · Karachi-Hyderabad Motorway, Nooriabad, Nooriabad150 kW DC PKR 130/kWh
-
206.2km awayABB Charging StationKarachi · M-9 motorway, near Karachi toll plaza, M-9 motorway, Sindh50 kW DC PKR 109/kWh
Frequently asked questions
Where is HUBCO - PSO New Ali Moro?
HUBCO - PSO New Ali Moro is at Moro, N5 Highway, Moro, 25.2 km from the centre of Dadu. The directions button opens turn-by-turn navigation.
How fast is charging at HUBCO - PSO New Ali Moro?
It is a DC fast charger rated at 60 kW over CCS2. A BYD Atto 3 draws up to 60 kW here, so 20 to 80 percent takes about 48 minutes.
How much does it cost to charge at HUBCO - PSO New Ali Moro?
The listed price is PKR 120 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,355.
What are the opening hours at HUBCO - PSO New Ali Moro?
It is listed as open 24 hours, seven days a week.
Which connector does HUBCO - PSO New Ali Moro use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem — in the app.