Sarai

EV charging station · Dadu

HUBCO - PSO New Ali Moro

60 kW DCCCS2PKR 120/kWh

HUBCO - PSO New Ali Moro is a DC fast charger in Dadu, operated by HUBCO Green. It is at Moro, N5 Highway, Moro, 25.2 km from the city centre. It delivers up to 60 kW over CCS2 at PKR 120 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.

Charging details

Location
Moro, N5 Highway, Moro · 25.2 km from Dadu centre
Operator
HUBCO Green
Charger type
DC fast · 60 kW
Connectors
CCS2
Price
PKR 120/kWh — reported by drivers, advisory
Phone
03002478828
Coordinates
26.69047, 68.02584 · Open in Google Maps
Listing
Community listing · last checked 2026-09-18

Opening hours

MondayOpen 24 hours
TuesdayOpen 24 hours
WednesdayOpen 24 hours
ThursdayOpen 24 hours
FridayOpen 24 hours
SaturdayOpen 24 hours
SundayOpen 24 hours

Hours are as listed and can change without notice — call ahead if you are arriving late.

What a charge here costs, by car

20% to 80% — the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 120/kWh.

CarBatteryDraws20→80%TimeCost
BYD Atto 3 60 kWh 60 kW 36 kWh ~48 min PKR 4,355
MG ZS EV 72 kWh 60 kW 44 kWh ~58 min PKR 5,227
BYD Seal 82 kWh 60 kW 50 kWh ~66 min PKR 5,940
BYD Atto 2 45 kWh 60 kW 27 kWh ~36 min PKR 3,247
BYD Sealion 7 82 kWh 60 kW 50 kWh ~66 min PKR 5,944
Deepal S07 EV 79 kWh 60 kW 48 kWh ~64 min PKR 5,758

Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.

Nearest alternatives

If HUBCO - PSO New Ali Moro is occupied, out of order or shut, these are the closest:

All 1 chargers in Dadu →

Frequently asked questions

Where is HUBCO - PSO New Ali Moro?

HUBCO - PSO New Ali Moro is at Moro, N5 Highway, Moro, 25.2 km from the centre of Dadu. The directions button opens turn-by-turn navigation.

How fast is charging at HUBCO - PSO New Ali Moro?

It is a DC fast charger rated at 60 kW over CCS2. A BYD Atto 3 draws up to 60 kW here, so 20 to 80 percent takes about 48 minutes.

How much does it cost to charge at HUBCO - PSO New Ali Moro?

The listed price is PKR 120 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,355.

What are the opening hours at HUBCO - PSO New Ali Moro?

It is listed as open 24 hours, seven days a week.

Which connector does HUBCO - PSO New Ali Moro use?

CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.

Does it still work?

Read the latest driver reports, confirm it works, or report a problem — in the app.

← All EV charging stations in Dadu

Download the app Join on WhatsApp