EV charging station · Kotri
Ali Baba CNG Filling Station
Ali Baba CNG Filling Station is a DC fast charger in Kotri, operated by A Charge. It is at Karachi-Hyderabad Motorway, Nooriabad, Nooriabad, 55.1 km from the city centre. It delivers up to 150 kW over CCS2 at PKR 130 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
On the M-9. Ali Baba CNG Filling Station is at Nooriabad, 1104 km from Lahore and 95 km from Karachi. It is on the Lahore-bound side, so it serves traffic heading to Lahore. Heading to Karachi? Use Al-Madina CNG Station - M-9 Nooriabad (150 kW) on the other side. See the whole Lahore to Karachi drive.
Charging details
- Location
- Karachi-Hyderabad Motorway, Nooriabad, Nooriabad · 55.1 km from Kotri centre
- Operator
- A Charge
- Charger type
- DC fast · 150 kW
- Connectors
- CCS2
- Charging points
- 2
- Price
- PKR 130/kWh (reported by drivers, advisory)
- Phone
- 03035249996
- Coordinates
- 25.17876, 67.80125 · Open in Google Maps
- Listing
- Imported from a public charger index, then de-duplicated, geocoded and reviewed before publishing. Confirmed by a driver who charged here. How we check every listing
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice. Call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 130/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 88 kW car max | 36 kWh | ~33 min | PKR 4,717 |
| MG ZS EV | 72 kWh | 92 kW car max | 44 kWh | ~38 min | PKR 5,663 |
| BYD Seal | 82 kWh | 150 kW | 50 kWh | ~26 min | PKR 6,435 |
| BYD Atto 2 | 45 kWh | 65 kW car max | 27 kWh | ~33 min | PKR 3,518 |
| BYD Sealion 7 | 82 kWh | 150 kW | 50 kWh | ~26 min | PKR 6,440 |
| Deepal S07 EV | 79 kWh | 93 kW car max | 48 kWh | ~41 min | PKR 6,238 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If Ali Baba CNG Filling Station is occupied, out of order or shut, these are the closest:
-
0.6km awayAl-Madina CNG Station - M-9 NooriabadKotri · M-9 Motorway, Nooriabad, Nooriabad150 kW DC PKR 110/kWh
-
60.2km awayHUBCO PSO Al FalahHyderabad · Hyderabad Bypass road, Hyderabad, Sindh60 kW DC PKR 150/kWh
-
62.8km awayShell Recharge Karachi Hyderabad M9Karachi · M-9 motorway, near Karachi toll plaza, M-9 motorway, Sindh50 kW DC PKR 109/kWh
-
63.4km awayBilal Petroleum EV ChargerKarachi · X6P5+CVC, Karachi - Hyderabad Motorway, Malir Cantonment, Karachi, Pakistan, Karachi150 kW DC PKR 109/kWh
-
75.4km awayEV Charging StationKarachi · North Karachi Industrial Area, Sector 12-D, Plot No. 11, Karachi, Sindh240 kW DC PKR 80/kWh
-
75.6km awayShell Recharge Askari 4Karachi · Gulistan-e-Johar, Rashid Minhas Rd, next to McDonalds, Karachi50 kW DC PKR 102/kWh
On the way to somewhere
Ali Baba CNG Filling Station sits on these motorway routes, planned stop by stop:
Frequently asked questions
Where is Ali Baba CNG Filling Station?
Ali Baba CNG Filling Station is at Karachi-Hyderabad Motorway, Nooriabad, Nooriabad, 55.1 km from the centre of Kotri. The directions button opens turn-by-turn navigation.
How fast is charging at Ali Baba CNG Filling Station?
It is a DC fast charger rated at 150 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.
How much does it cost to charge at Ali Baba CNG Filling Station?
The listed price is PKR 130 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,717.
What are the opening hours at Ali Baba CNG Filling Station?
It is listed as open 24 hours, seven days a week.
Which connector does Ali Baba CNG Filling Station use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem, in the app.