Sarai

EV charging station · Karachi

EV Charging Station, North Karachi Industrial Area, Sector 12-D, Plot No. 11, Karachi, Sindh

240 kW DCCCS2PKR 80/kWh1 point

EV Charging Station is a DC fast charger in Karachi. It is at North Karachi Industrial Area, Sector 12-D, Plot No. 11, Karachi, Sindh, 15.0 km from the city centre. It delivers up to 240 kW over CCS2 at PKR 80 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.

Charging details

Location
North Karachi Industrial Area, Sector 12-D, Plot No. 11, Karachi, Sindh · 15.0 km from Karachi centre
Charger type
DC fast · 240 kW
Connectors
CCS2
Charging points
1
Price
PKR 80/kWh (reported by drivers, advisory)
Phone
03126067480, 03032231032, 03353344926
Coordinates
24.96986, 67.08859 · Open in Google Maps
Listing
Imported from open charging data, then de-duplicated, geocoded and reviewed before publishing. How we check every listing

What a charge here costs, by car

20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 80/kWh.

CarBatteryDraws20→80%TimeCost
BYD Atto 3 60 kWh 88 kW car max 36 kWh ~33 min PKR 2,903
MG ZS EV 72 kWh 92 kW car max 44 kWh ~38 min PKR 3,485
BYD Seal 82 kWh 150 kW car max 50 kWh ~26 min PKR 3,960
BYD Atto 2 45 kWh 65 kW car max 27 kWh ~33 min PKR 2,165
BYD Sealion 7 82 kWh 150 kW car max 50 kWh ~26 min PKR 3,963
Deepal S07 EV 79 kWh 93 kW car max 48 kWh ~41 min PKR 3,839

Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.

Nearest alternatives

If EV Charging Station is occupied, out of order or shut, these are the closest:

All 15 chargers in Karachi →

On the way to somewhere

EV Charging Station sits on these motorway routes, planned stop by stop:

Frequently asked questions

Where is EV Charging Station?

EV Charging Station is at North Karachi Industrial Area, Sector 12-D, Plot No. 11, Karachi, Sindh, 15.0 km from the centre of Karachi. The directions button opens turn-by-turn navigation.

How fast is charging at EV Charging Station?

It is a DC fast charger rated at 240 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.

How much does it cost to charge at EV Charging Station?

The listed price is PKR 80 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 2,903.

Which connector does EV Charging Station use?

CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.

Does it still work?

Read the latest driver reports, confirm it works, or report a problem, in the app.

← All EV charging stations in Karachi

Download the app Join on WhatsApp