Sarai

EV charging station · Jhelum

Omoda 11kW Charger - Mangla

11 kW ACType 2PKR 150/kWh

Omoda 11kW Charger - Mangla is an AC charging point in Jhelum. It is at 2nd Avenue Mangla Cantt, Mangla Cantt, 24.2 km from the city centre. It delivers up to 11 kW over Type 2 at PKR 150 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.

Charging details

Location
2nd Avenue Mangla Cantt, Mangla Cantt · 24.2 km from Jhelum centre
Charger type
AC · 11 kW
Connectors
Type 2
Price
PKR 150/kWh (reported by drivers, advisory)
Phone
+923000130175
Coordinates
33.12637, 73.61289 · Open in Google Maps
Listing
Imported from a public charger index, then de-duplicated, geocoded and reviewed before publishing. How we check every listing

What a charge here costs, by car

20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 150/kWh.

CarBatteryDraws20→80%TimeCost
BYD Atto 3 60 kWh 7 kW car max 36 kWh ~327 min PKR 5,443
MG ZS EV 72 kWh 11 kW 44 kWh ~250 min PKR 6,534
BYD Seal 82 kWh 11 kW 50 kWh ~284 min PKR 7,425
BYD Atto 2 45 kWh 11 kW 27 kWh ~155 min PKR 4,059
BYD Sealion 7 82 kWh 11 kW 50 kWh ~284 min PKR 7,430
Deepal S07 EV 79 kWh 7 kW car max 48 kWh ~433 min PKR 7,197

Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.

Nearest alternatives

If Omoda 11kW Charger - Mangla is occupied, out of order or shut, these are the closest:

All 2 chargers in Jhelum →

Frequently asked questions

Where is Omoda 11kW Charger - Mangla?

Omoda 11kW Charger - Mangla is at 2nd Avenue Mangla Cantt, Mangla Cantt, 24.2 km from the centre of Jhelum. The directions button opens turn-by-turn navigation.

How fast is charging at Omoda 11kW Charger - Mangla?

It is a AC charger rated at 11 kW over TYPE2. A BYD Atto 3 draws up to 7 kW here, so 20 to 80 percent takes about 327 minutes.

How much does it cost to charge at Omoda 11kW Charger - Mangla?

The listed price is PKR 150 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 5,443.

Which connector does Omoda 11kW Charger - Mangla use?

TYPE2. Check your car's page for what it takes.

Does it still work?

Read the latest driver reports, confirm it works, or report a problem, in the app.

← All EV charging stations in Jhelum

Download the app Join on WhatsApp