EV charging station · Karachi
HUBCO - PSO Q-Star
HUBCO - PSO Q-Star is a DC fast charger in Karachi, operated by HUBCO Green. It is at Opposite Gora Qabristan, Karachi, 5.3 km from the city centre. It delivers up to 60 kW over CCS2 at PKR 120 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
Charging details
- Location
- Opposite Gora Qabristan, Karachi · 5.3 km from Karachi centre
- Operator
- HUBCO Green
- Charger type
- DC fast · 60 kW
- Connectors
- CCS2
- Price
- PKR 120/kWh — reported by drivers, advisory
- Coordinates
- 24.85299, 67.05273 · Open in Google Maps
- Listing
- Community listing · last checked 2026-09-18
What a charge here costs, by car
20% to 80% — the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 120/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 60 kW | 36 kWh | ~48 min | PKR 4,355 |
| MG ZS EV | 72 kWh | 60 kW | 44 kWh | ~58 min | PKR 5,227 |
| BYD Seal | 82 kWh | 60 kW | 50 kWh | ~66 min | PKR 5,940 |
| BYD Atto 2 | 45 kWh | 60 kW | 27 kWh | ~36 min | PKR 3,247 |
| BYD Sealion 7 | 82 kWh | 60 kW | 50 kWh | ~66 min | PKR 5,944 |
| Deepal S07 EV | 79 kWh | 60 kW | 48 kWh | ~64 min | PKR 5,758 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If HUBCO - PSO Q-Star is occupied, out of order or shut, these are the closest:
-
2.6km awayGO Petroleum - Libra AutosKarachi · Civil Lines, Karachi, Sindh160 kW DC PKR 110/kWh
-
3.7km awayInverex Charging StationKarachi · Plot No. 14, Main Shahra-e-Faisal, Karachi Administration Employees Housing Society Bangalore Town, Karachi, Sindh60 kW DC PKR 115/kWh
-
4.1km awayShell Recharge Charging StationKarachi · Khayaban-e-Bahria, DHA Phase 5, Karachi, Sindh180 kW DC PKR 105/kWh
-
7.9km awayCaltex EV Charger KarachiKarachi · VXVQ+F9F, 32B, Sindh Industrial Trading Estate, Karachi, Pakistan120 kW DC PKR 110/kWh
-
8.3km awayEV Charging Station – Gulistan-e-JoharKarachi · Gulistan-e-Johar, Rashid Minhas Rd, next to McDonalds, Karachi50 kW DC price n/a
-
8.9km awayEV Charging StationKarachi · North Nazimabad, Block-A, Office No. 15, KDA Apartment, Shop No. 34, Last Shop, St-08, Karachi, Sindh120 kW DC price n/a
On the way to somewhere
HUBCO - PSO Q-Star sits on these motorway routes, planned stop by stop:
Frequently asked questions
Where is HUBCO - PSO Q-Star?
HUBCO - PSO Q-Star is at Opposite Gora Qabristan, Karachi, 5.3 km from the centre of Karachi. The directions button opens turn-by-turn navigation.
How fast is charging at HUBCO - PSO Q-Star?
It is a DC fast charger rated at 60 kW over CCS2. A BYD Atto 3 draws up to 60 kW here, so 20 to 80 percent takes about 48 minutes.
How much does it cost to charge at HUBCO - PSO Q-Star?
The listed price is PKR 120 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,355.
Which connector does HUBCO - PSO Q-Star use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem — in the app.