EV charging station · Lahore
Go Green Charging - Packages Mall - charger 2
Go Green Charging - Packages Mall - charger 2 is an AC charging point in Lahore, operated by Go Green Avenue. It is at Packages Mall, Walton Road, Lahore, 5.4 km from the city centre. It delivers up to 22 kW over Type 2 at PKR 120 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
More chargers at this site. This is one of 2 chargers at the same spot. The other is a 120 kW DC charger; its plugs, price and status are not listed yet.
Charging details
- Location
- Packages Mall, Walton Road, Lahore · 5.4 km from Lahore centre
- Operator
- Go Green Avenue
- Charger type
- AC · 22 kW
- Connectors
- Type 2
- Charging points
- 1
- Price
- PKR 120/kWh (reported by drivers, advisory)
- Phone
- 03314483699
- Coordinates
- 31.47174, 74.35604 · Open in Google Maps
- Listing
- Added by a driver in the Sarai app, then de-duplicated, geocoded and reviewed before publishing. How we check every listing
What a charge here costs, by car
20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 120/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 7 kW car max | 36 kWh | ~327 min | PKR 4,355 |
| MG ZS EV | 72 kWh | 11 kW car max | 44 kWh | ~250 min | PKR 5,227 |
| BYD Seal | 82 kWh | 11 kW car max | 50 kWh | ~284 min | PKR 5,940 |
| BYD Atto 2 | 45 kWh | 11 kW car max | 27 kWh | ~155 min | PKR 3,247 |
| BYD Sealion 7 | 82 kWh | 11 kW car max | 50 kWh | ~284 min | PKR 5,944 |
| Deepal S07 EV | 79 kWh | 7 kW car max | 48 kWh | ~433 min | PKR 5,758 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If Go Green Charging - Packages Mall - charger 2 is occupied, out of order or shut, these are the closest:
-
0.1km awayEV Charging - Packages Mall (2nd)Lahore · Packages Mall, LahorekW n/a PKR 120/kWh
-
3.8km awayHUBCO Total GulbergLahore · MM Alam Road Gulberg III, Lahore, Punjab120 kW DC PKR 120/kWh
-
4.6km awayHascol DHA Ph 2Lahore · Sector U DHA Phase 2, Lahore, Pakistan120 kW DC PKR 120/kWh
-
4.7km awayInverex EV ChargerLahore · Plot 801, Block C Faisal Town, Lahore, 54770, Pakistan60 kW DC PKR 100/kWh
-
4.8km awayDongfeng Gulberg DealershipLahore · Main Boulevard, Block E1, Gulberg III, Lahore, Punjab30 kW DC PKR 110/kWh
-
4.9km awayGo Green Charging - Main Boulevard GulbergLahore · Main Boulevard Gulberg, Lahore22 kW AC PKR 100/kWh
On the way to somewhere
Go Green Charging - Packages Mall - charger 2 sits on these motorway routes, planned stop by stop:
Frequently asked questions
Where is Go Green Charging - Packages Mall - charger 2?
Go Green Charging - Packages Mall - charger 2 is at Packages Mall, Walton Road, Lahore, 5.4 km from the centre of Lahore. The directions button opens turn-by-turn navigation.
How fast is charging at Go Green Charging - Packages Mall - charger 2?
It is a AC charger rated at 22 kW over TYPE2. A BYD Atto 3 draws up to 7 kW here, so 20 to 80 percent takes about 327 minutes.
How much does it cost to charge at Go Green Charging - Packages Mall - charger 2?
The listed price is PKR 120 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,355.
Which connector does Go Green Charging - Packages Mall - charger 2 use?
TYPE2. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem, in the app.