EV charging station · Lahore
Go Green, Mall of Lahore
Go Green, Mall of Lahore is a DC fast charger in Lahore. It is at Mall of Lahore, Tufail Rd, Cantt, Lahore, Punjab, 2.1 km from the city centre. It delivers up to 180 kW over CCS2 at PKR 120 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
Photos of Go Green, Mall of Lahore
Photo: Open Charge Map contributors.
Charging details
- Location
- Mall of Lahore, Tufail Rd, Cantt, Lahore, Punjab · 2.1 km from Lahore centre
- Charger type
- DC fast · 180 kW
- Connectors
- CCS2
- Charging points
- 2
- Price
- PKR 120/kWh (reported by drivers, advisory)
- Phone
- +923208555015
- Confirmed working
- by 1 driver
- Coordinates
- 31.52930, 74.37872 · Open in Google Maps
- Listing
- Imported from open charging data, then de-duplicated, geocoded and reviewed before publishing. How we check every listing
Opening hours
| Monday | 10:00 to 22:00 |
|---|---|
| Tuesday | 10:00 to 22:00 |
| Wednesday | 10:00 to 22:00 |
| Thursday | 10:00 to 22:00 |
| Friday | 10:00 to 22:00 |
| Saturday | 10:00 to 22:00 |
| Sunday | 10:00 to 22:00 |
Hours are as listed and can change without notice. Call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 120/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 88 kW car max | 36 kWh | ~33 min | PKR 4,355 |
| MG ZS EV | 72 kWh | 92 kW car max | 44 kWh | ~38 min | PKR 5,227 |
| BYD Seal | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 5,940 |
| BYD Atto 2 | 45 kWh | 65 kW car max | 27 kWh | ~33 min | PKR 3,247 |
| BYD Sealion 7 | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 5,944 |
| Deepal S07 EV | 79 kWh | 93 kW car max | 48 kWh | ~41 min | PKR 5,758 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If Go Green, Mall of Lahore is occupied, out of order or shut, these are the closest:
-
0.8km awayPSO Girja ChowkLahore · Girja Chowk, Cantt, Lahore, Punjab180 kW DC PKR 90/kWh
-
1.3km awayShell Recharge Shami RoadLahore · Shell Station, Lahore Cantt, Lahore180 kW DC PKR 105/kWh
-
3.8km awayHUBCO Total GulbergLahore · MM Alam Road Gulberg III, Lahore, Punjab120 kW DC PKR 120/kWh
-
5.4km awayShell Recharge Bhatta ChowkLahore · FCV9+Q68, Ghazi Rd, Sector S DHA Phase 2, Lahore, Pakistan, Lahore180 kW DC PKR 95/kWh
-
6.5km awayHascol DHA Ph 2Lahore · Sector U DHA Phase 2, Lahore, Pakistan120 kW DC PKR 120/kWh
-
9.3km awayEURO Express 18Lahore · Euro pump, Bedian Rd (near Askari 11 main gate), Lahore, Punjab180 kW DC PKR 105/kWh
On the way to somewhere
Go Green, Mall of Lahore sits on these motorway routes, planned stop by stop:
Frequently asked questions
Where is Go Green, Mall of Lahore?
Go Green, Mall of Lahore is at Mall of Lahore, Tufail Rd, Cantt, Lahore, Punjab, 2.1 km from the centre of Lahore. The directions button opens turn-by-turn navigation.
How fast is charging at Go Green, Mall of Lahore?
It is a DC fast charger rated at 180 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.
How much does it cost to charge at Go Green, Mall of Lahore?
The listed price is PKR 120 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,355.
What are the opening hours at Go Green, Mall of Lahore?
Opening hours are listed in the table above, day by day. Hours can change without notice, so call ahead if you are arriving late.
Which connector does Go Green, Mall of Lahore use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem, in the app.