EV charging station · Rawalpindi
Chakri Service Area North Bound (M-2)
Chakri Service Area North Bound (M-2) is a DC fast charger in Rawalpindi, operated by Indigost. It is at M-2 Motorway, Chakri Service Area, Chakri, 34.7 km from the city centre. It delivers up to 360 kW over CCS2 at PKR 110 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
On the M-2. Chakri Service Area North Bound (M-2) is at Chakri service area, 318 km from Lahore and 58 km from Islamabad. It is on the Islamabad-bound side, so it serves traffic heading to Islamabad. Heading to Lahore? There is no charger on that side here; the next one is Kallar Kahar service area, 74 km on (Kallar Kahar Service Area South Bound, 360 kW). See the whole Lahore to Islamabad drive.
Photos of Chakri Service Area North Bound (M-2)
Charging details
- Location
- M-2 Motorway, Chakri Service Area, Chakri · 34.7 km from Rawalpindi centre
- Operator
- Indigost
- Charger type
- DC fast · 360 kW
- Connectors
- CCS2
- Charging points
- 2
- Price
- PKR 110/kWh (reported by drivers, advisory)
- Phone
- 03206661367
- Coordinates
- 33.32171, 72.78327 · Open in Google Maps
- Listing
- Imported from a public charger index, then de-duplicated, geocoded and reviewed before publishing. Confirmed by a driver who charged here. How we check every listing
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice. Call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 110/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 88 kW car max | 36 kWh | ~33 min | PKR 3,992 |
| MG ZS EV | 72 kWh | 92 kW car max | 44 kWh | ~38 min | PKR 4,792 |
| BYD Seal | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 5,445 |
| BYD Atto 2 | 45 kWh | 65 kW car max | 27 kWh | ~33 min | PKR 2,977 |
| BYD Sealion 7 | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 5,449 |
| Deepal S07 EV | 79 kWh | 93 kW car max | 48 kWh | ~41 min | PKR 5,278 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If Chakri Service Area North Bound (M-2) is occupied, out of order or shut, these are the closest:
-
29.7km awayMall VIII - Mumtaz CityRawalpindi · Plot #8, Mumtaz City, Islamabad120 kW DC PKR 120/kWh
-
34.4km awayHUBCO APL, Hakla South (M-1)Rawalpindi · Hakla Rest Area, Islamabad-Peshawar Motorway, Hakla120 kW DC PKR 110/kWh
-
34.9km awayHUBCO APL, Hakla North (M-1)Rawalpindi · 607 Street 13G, Islamabad, Pakistan120 kW DC PKR 110/kWh
-
39.0km awayG13 PSO Petrol PumpIslamabad · Service Rd W, G-13, Islamabad, Zone 1, Islamabad Capital Territory, 44000, Pakistan250 kW DC PKR 120/kWh
-
40.1km awayAttock EV ChargerRawalpindi · Old Airport Road, Jhanda Chichi, Rawalpindi, Punjab50 kW DC PKR 110/kWh
-
41.3km awayGo Green, Giga Mall EV Station - charger 2Rawalpindi · Giga Mall, DHA Phase 2 (DHA Entrance Side), Rawalpindi60 kW DC PKR 110/kWh
On the way to somewhere
Chakri Service Area North Bound (M-2) sits on this motorway route, planned stop by stop:
Frequently asked questions
Where is Chakri Service Area North Bound (M-2)?
Chakri Service Area North Bound (M-2) is at M-2 Motorway, Chakri Service Area, Chakri, 34.7 km from the centre of Rawalpindi. The directions button opens turn-by-turn navigation.
How fast is charging at Chakri Service Area North Bound (M-2)?
It is a DC fast charger rated at 360 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.
How much does it cost to charge at Chakri Service Area North Bound (M-2)?
The listed price is PKR 110 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 3,992.
What are the opening hours at Chakri Service Area North Bound (M-2)?
It is listed as open 24 hours, seven days a week.
Which connector does Chakri Service Area North Bound (M-2) use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem, in the app.