EV charging station · Chiniot
EV Charging Station – Pindi Bhattian
EV Charging Station – Pindi Bhattian is a DC fast charger in Chiniot. It is at Pindi Bhattian, Pindi Bhattian, 37.6 km from the city centre. It delivers up to 180 kW over CCS2 at PKR 140 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
Charging details
- Location
- Pindi Bhattian, Pindi Bhattian · 37.6 km from Chiniot centre
- Charger type
- DC fast · 180 kW
- Connectors
- CCS2
- Charging points
- 2
- Price
- PKR 140/kWh — reported by drivers, advisory
- Phone
- 03237706746
- Coordinates
- 31.93424, 73.28745 · Open in Google Maps
- Listing
- Community listing, verified · last checked 2026-09-18
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice — call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% — the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 140/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 88 kW car max | 36 kWh | ~33 min | PKR 5,080 |
| MG ZS EV | 72 kWh | 92 kW car max | 44 kWh | ~38 min | PKR 6,098 |
| BYD Seal | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 6,930 |
| BYD Atto 2 | 45 kWh | 65 kW car max | 27 kWh | ~33 min | PKR 3,788 |
| BYD Sealion 7 | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 6,935 |
| Deepal S07 EV | 79 kWh | 93 kW car max | 48 kWh | ~41 min | PKR 6,717 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If EV Charging Station – Pindi Bhattian is occupied, out of order or shut, these are the closest:
-
17.0km awaySial Service Area – North Bound (M-2)Chiniot · M-2 Motorway, Sial Service Area, Sial360 kW DC PKR 130/kWh
-
56.8km awayGMSA EV Charger in Shell StationFaisalabad · East Canal Expressway, near Lyallpur Galleria Mall, Faisalabad, Punjab120 kW DC PKR 160/kWh
-
60.7km awayPSO Rehmat PetroleumFaisalabad · Chen One Rd, off at PSO, D Ground Block B People's Colony No 1, Faisalabad, Pakistan120 kW DC PKR 120/kWh
-
69.0km awayDewan A-Charge Bhera NorthSargodha · M2 Bhera Service Area, Bhera, Pakistan120 kW DC PKR 150/kWh
-
69.0km awayDewan A-Charge Bhera SouthSargodha · M2 Bhera Rest Area, Bhera, Pakistan240 kW DC PKR 150/kWh
-
69.1km awayPSO Bhera North (M-2)Sargodha · M2 Bhera Service Area, Bhera, Pakistan180 kW DC PKR 150/kWh
On the way to somewhere
EV Charging Station – Pindi Bhattian sits on this motorway route, planned stop by stop:
Frequently asked questions
Where is EV Charging Station – Pindi Bhattian?
EV Charging Station – Pindi Bhattian is at Pindi Bhattian, Pindi Bhattian, 37.6 km from the centre of Chiniot. The directions button opens turn-by-turn navigation.
How fast is charging at EV Charging Station – Pindi Bhattian?
It is a DC fast charger rated at 180 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.
How much does it cost to charge at EV Charging Station – Pindi Bhattian?
The listed price is PKR 140 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 5,080.
What are the opening hours at EV Charging Station – Pindi Bhattian?
It is listed as open 24 hours, seven days a week.
Which connector does EV Charging Station – Pindi Bhattian use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem — in the app.