EV charging station · Chiniot
Sial Service Area North Bound (M-2)
Sial Service Area North Bound (M-2) is a DC fast charger in Chiniot, operated by Indigost Solar. It is at M-2 Motorway, Sial Service Area, Sial, 30.3 km from the city centre. It delivers up to 360 kW over CCS2 at PKR 130 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
On the M-2. Sial Service Area North Bound (M-2) is at Sial service area, 141 km from Lahore and 235 km from Islamabad. It is on the Islamabad-bound side, so it serves traffic heading to Islamabad. Heading to Lahore? There is no charger on that side here; the next one is Pindi Bhattian interchange, 18 km on (EV Charging Station - Pindi Bhattian, 180 kW). See the whole Lahore to Islamabad drive.
Photos of Sial Service Area North Bound (M-2)
Charging details
- Location
- M-2 Motorway, Sial Service Area, Sial · 30.3 km from Chiniot centre
- Operator
- Indigost Solar
- Charger type
- DC fast · 360 kW
- Connectors
- CCS2
- Charging points
- 2
- Price
- PKR 130/kWh (reported by drivers, advisory)
- Phone
- 03206661369
- Confirmed working
- by 12 drivers
- Coordinates
- 31.96847, 73.11154 · Open in Google Maps
- Listing
- Imported from a public charger index, then de-duplicated, geocoded and reviewed before publishing. Confirmed by a driver who charged here. How we check every listing
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice. Call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 130/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 88 kW car max | 36 kWh | ~33 min | PKR 4,717 |
| MG ZS EV | 72 kWh | 92 kW car max | 44 kWh | ~38 min | PKR 5,663 |
| BYD Seal | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 6,435 |
| BYD Atto 2 | 45 kWh | 65 kW car max | 27 kWh | ~33 min | PKR 3,518 |
| BYD Sealion 7 | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 6,440 |
| Deepal S07 EV | 79 kWh | 93 kW car max | 48 kWh | ~41 min | PKR 6,238 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If Sial Service Area North Bound (M-2) is occupied, out of order or shut, these are the closest:
-
17.0km awayEV Charging Station - Pindi Bhattian - charger 2Chiniot · Pindi Bhattian, Pindi Bhattian180 kW DC PKR 120/kWh
-
17.0km awayEV Charging Station - Pindi BhattianChiniot · Pindi Bhattian, Pindi Bhattian180 kW DC PKR 120/kWh
-
37.3km awayTotal Quraish Filling StationFaisalabad · Total Parco Pump, Expressway, FIEDMC, Faisalabad120 kW DC PKR 120/kWh
-
56.3km awayCivic EV Charging StationFaisalabad · F58R+M53, opposite Paradise Valley, Civic Center Faisalabad, 38000, Pakistan120 kW DC PKR 110/kWh
-
58.0km awayDewan A-Charge Bhera NorthSargodha · M2 Bhera Service Area, Bhera, Pakistan120 kW DC PKR 150/kWh
-
58.0km awayDewan A-Charge Bhera SouthSargodha · M2 Bhera Rest Area, Bhera, Pakistan240 kW DC PKR 150/kWh
On the way to somewhere
Sial Service Area North Bound (M-2) sits on this motorway route, planned stop by stop:
Frequently asked questions
Where is Sial Service Area North Bound (M-2)?
Sial Service Area North Bound (M-2) is at M-2 Motorway, Sial Service Area, Sial, 30.3 km from the centre of Chiniot. The directions button opens turn-by-turn navigation.
How fast is charging at Sial Service Area North Bound (M-2)?
It is a DC fast charger rated at 360 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.
How much does it cost to charge at Sial Service Area North Bound (M-2)?
The listed price is PKR 130 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,717.
What are the opening hours at Sial Service Area North Bound (M-2)?
It is listed as open 24 hours, seven days a week.
Which connector does Sial Service Area North Bound (M-2) use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem, in the app.