EV charging station · Mandi Bahauddin
Kallar Kahar Service Area North Bound
Kallar Kahar Service Area North Bound is a DC fast charger in Mandi Bahauddin, operated by NHA EV Network. It is at M-2 Motorway, Kallar Kahar, Kallar Kahar, 75.1 km from the city centre. It delivers up to 360 kW over CCS2 at PKR 120 per kWh. Below is what a charge here costs and how long it takes for the cars on Pakistani roads, the opening hours, and the nearest alternatives if it is occupied.
On the M-2. Kallar Kahar Service Area North Bound is at Kallar Kahar service area, 244 km from Lahore and 132 km from Islamabad. It is on the Islamabad-bound side, so it serves traffic heading to Islamabad. Heading to Lahore? Use Kallar Kahar Service Area South Bound (360 kW) on the other side. See the whole Lahore to Islamabad drive.
Charging details
- Location
- M-2 Motorway, Kallar Kahar, Kallar Kahar · 75.1 km from Mandi Bahauddin centre
- Operator
- NHA EV Network
- Charger type
- DC fast · 360 kW
- Connectors
- CCS2
- Price
- PKR 120/kWh (reported by drivers, advisory)
- Phone
- 03375836687
- Coordinates
- 32.76934, 72.71905 · Open in Google Maps
- Listing
- Imported from a public charger index, then de-duplicated, geocoded and reviewed before publishing. Reported faulty by a driver, so the trip planner is not routing through it until someone confirms it working. How we check every listing
Opening hours
| Monday | Open 24 hours |
|---|---|
| Tuesday | Open 24 hours |
| Wednesday | Open 24 hours |
| Thursday | Open 24 hours |
| Friday | Open 24 hours |
| Saturday | Open 24 hours |
| Sunday | Open 24 hours |
Hours are as listed and can change without notice. Call ahead if you are arriving late.
What a charge here costs, by car
20% to 80% is the stretch you actually charge on a trip. Times allow for the way DC power tapers as the battery fills; costs use this charger's listed PKR 120/kWh.
| Car | Battery | Draws | 20→80% | Time | Cost |
|---|---|---|---|---|---|
| BYD Atto 3 | 60 kWh | 88 kW car max | 36 kWh | ~33 min | PKR 4,355 |
| MG ZS EV | 72 kWh | 92 kW car max | 44 kWh | ~38 min | PKR 5,227 |
| BYD Seal | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 5,940 |
| BYD Atto 2 | 45 kWh | 65 kW car max | 27 kWh | ~33 min | PKR 3,247 |
| BYD Sealion 7 | 82 kWh | 150 kW car max | 50 kWh | ~26 min | PKR 5,944 |
| Deepal S07 EV | 79 kWh | 93 kW car max | 48 kWh | ~41 min | PKR 5,758 |
Real figures move with battery temperature, the weather and how full the battery already is. The Sarai app works it out from your car's actual charging curve and state of charge.
Nearest alternatives
If Kallar Kahar Service Area North Bound is occupied, out of order or shut, these are the closest:
-
1.4km awayKallar Kahar Service Area South BoundMandi Bahauddin · M-2 Motorway, Kallar Kahar, Kallar Kahar360 kW DC PKR 130/kWh
-
37.4km awayChan EV Charging Station BheraSargodha · FV7M+6HW Interchange, Bhera, Pakistan, Bhera120 kW DC PKR 120/kWh
-
38.3km awayPSO Bhera North (M-2)Sargodha · M2 Bhera Service Area, Bhera, Pakistan180 kW DC PKR 150/kWh
-
38.4km awayDewan A-Charge Bhera NorthSargodha · M2 Bhera Service Area, Bhera, Pakistan120 kW DC PKR 150/kWh
-
38.4km awayDewan A-Charge Bhera SouthSargodha · M2 Bhera Rest Area, Bhera, Pakistan240 kW DC PKR 150/kWh
-
61.7km awayChakri Service Area North Bound (M-2)Rawalpindi · M-2 Motorway, Chakri Service Area, Chakri360 kW DC PKR 110/kWh
On the way to somewhere
Kallar Kahar Service Area North Bound sits on this motorway route, planned stop by stop:
Frequently asked questions
Where is Kallar Kahar Service Area North Bound?
Kallar Kahar Service Area North Bound is at M-2 Motorway, Kallar Kahar, Kallar Kahar, 75.1 km from the centre of Mandi Bahauddin. The directions button opens turn-by-turn navigation.
How fast is charging at Kallar Kahar Service Area North Bound?
It is a DC fast charger rated at 360 kW over CCS2. A BYD Atto 3 draws up to 88 kW here, so 20 to 80 percent takes about 33 minutes.
How much does it cost to charge at Kallar Kahar Service Area North Bound?
The listed price is PKR 120 per kWh. Charging a BYD Atto 3 from 20 to 80 percent is about 36 kWh, so roughly PKR 4,355.
What are the opening hours at Kallar Kahar Service Area North Bound?
It is listed as open 24 hours, seven days a week.
Which connector does Kallar Kahar Service Area North Bound use?
CCS2. CCS2 is the DC standard on almost every EV sold in Pakistan. Check your car's page for what it takes.
Does it still work?
Read the latest driver reports, confirm it works, or report a problem, in the app.